Precision machining subcontractor · 1 site, 42 CNC machines · 140 employeesThis War Map shows how we turn an operational review into an implementation plan. The dates show a possible sequence; the scope and schedule of a real engagement are agreed with you.
Findings
Where work gets held up, who has to step in, and what it costs in this example.
Quotes that arrive after the decision
About 25 RFQs a week. A new-part quote takes 6.2 days on average, and 41% are declined or sent after the buyer's deadline. Quotes sent within 3 days win about 30% of the time, against 18% overall.
One estimator for every drawing
Patrick Meunier estimates cycle times from 27 years of memory of similar parts. Every new-part quote waits in his queue.
Dates nobody trusts
Silog load dates are ignored and the real schedule is an Excel board rebuilt each morning. Delivery dates go to customers before material or machine time is confirmed.
Inspection paperwork holds parts
First-article reports are copied by hand from CMM output into forms. Parts wait for the report, and the report waits for the quality manager's time.
Illustrative time allocation for 10 interview roles
- Estimating, programming and engineering
- 23%
- Searching for drawings, history and records
- 22%
- Chasing suppliers, customers and the shop
- 21%
- Re-keying between systems and portals
- 18%
- Inspection and sign-offs
- 16%
These scenario percentages total 100%. They describe task categories for the 10 interview roles and are not extrapolated to all 140 employees.
Searching, chasing and re-keying take 61% of the observed time. Engineering work takes 23%, and inspection and sign-offs 16%.
SOP vs. Reality
The estimate itself, operation by operation, is skilled work and takes Patrick about an hour. The six days come from everything around it: the queue in front of him, the search for similar parts, and material and treatment prices requested one email at a time.
Silog holds routings and orders, but its load view is out of date because actual times and machine stops are entered late. Guillaume plans in Excel after a morning walk round the shop. Dates go to customers before material has arrived, and about one order in four gets a second date.
The CMM measures in minutes. The paperwork takes half a day: ballooning the drawing, copying each result into the AS9102 form and attaching the certificates. On an aerospace bracket with 112 characteristics, the copying alone took Antoine most of a morning.
Non-conformities are handled well on the day: parts are quarantined and a disposition is agreed. What gets lost is the record. NCs reach the Excel log days later, costs are rarely captured, and customer 8D reports are often late, which weighs on supplier scorecards.
Work that needs attention
Risk Register
Strategy Session · 30 min