Specialty chemicals
Operational Reality

Sample War Map

Specialty chemicals War Map

Specialty chemicals formulator · 2 sites near Lyon · 160 employees

Regulatory documents, lab release and dangerous goods paperwork all run through three people. Customers wait 6.5 working days for an SDS or REACH statement, and raw-material increases reach indexed invoices about nine weeks late.

A War Map is an operating map built from real cases and expert interviews. It shows where the business is fragile, what that costs, and what to fix first.

What you receive

  1. 01Operational Reality

    How the work really runs: people, systems, handoffs and exceptions.

  2. 02Findings

    What it costs: quantified problems, process gaps and key-person risks.

  3. 03Implementation plan

    What to fix first: prioritized systems, timeline and value drivers.

Request a Strategy Session

30 minutes. We recommend the right starting point.

Read the sampleSee all industry War Maps

Specialty chemicals formulator · 2 sites near Lyon · 160 employeesThis War Map shows how we turn an operational review into an implementation plan. The dates show a possible sequence; the scope and schedule of a real engagement are agreed with you.

Operational Reality

This is what we deliver: a map of where the business is fragile, what it costs, what to automate first, and which systems should exist so leadership can stop carrying the operation by hand.

Illustrative five-week work plan, February 2 to March 6, 2026. Eleven interview roles across ten departments, two production sites and six systems. The final week covers validation and handover.

Regulatory backlog
61 supplier SDS updates
waiting for a classification check, the oldest since July 2025
Release wait
1.6 days
on average between the last lab result and release in Sage X3
Indexation lag
9 weeks
before a raw-material increase reaches indexed invoices
11
Team members interviewed
across 10 departments and 2 sites
6
Systems accessed
2 with critical gaps
16
Workflows documented
11 with manual exceptions
23
Friction points identified
7 classified as critical

Five-week sample timeline · five work blocks

One row per week. Open a week to see each working day.

  1. Week 1
    Feb 2 to Feb 6

    Regulatory, lab and dock

    Scope set. Document requests, batch release and dangerous goods shipping shadowed on site.

    People: Hélène Marchand, Thierry Vasseur, Nadia Benali, Julien Roux, Camille Perrin, Karim Haddad

    Daily detail · 5 days
    Feb 2
    Kickoff + Scope Alignment

    Agreed scope across both sites. Chose five flows to shadow first: regulatory requests, lab release, ADR shipping, raw-material pricing and technical questions.

    Hélène Marchand · CEO
    Sage X3Excel
    Feb 3
    Regulatory Desk Shadow

    Followed 19 customer requests in one day. 4 quoted a customer article code that had to be matched to a trade name in Excel. 3 asked for an SDS language version that had to be generated first.

    Nadia Benali · Head of Regulatory Affairs
    OutlookSDS toolSharePoint
    Feb 4
    Lab Release Walkthrough

    Observed testing, result checks and release. Results live in the LIMS, release is keyed in Sage X3, and certificates of analysis are retyped into 340 customer-specific Excel templates.

    Julien Roux · QC Lab Manager
    LIMSSage X3Excel
    Feb 5
    Order Desk and Customer Chasers

    Counted why customers call. Top three reasons: a missing certificate of analysis, an SDS never received, and a delivery date pushed back by a batch held in quarantine.

    Camille Perrin · Customer Service Lead
    OutlookSage X3
    Feb 6
    Dangerous Goods Dock

    About 70% of shipments are dangerous goods. ADR data is missing in Sage X3 for 30% of items, so Karim copies UN number, class, packing group and tunnel code from SDS section 14 into an Excel template.

    Karim Haddad · Shipping Lead and ADR Safety Adviser
    Sage X3SDS toolExcel
  2. Week 2
    Feb 9 to Feb 13

    Purchasing, finance and technical service

    Price, margin and technical-answer flows mapped. 4 manual bridges between Sage X3 and other tools confirmed.

    People: Olivier Garnier, Sandrine Lefèvre, Mathieu Colin, Élodie Fournier, Romain Dubois

    Daily detail · 5 days
    Feb 9
    Raw-Material Price Tracking

    About 40 supplier price notices a month land in Olivier's inbox. He logs them in an Excel tracker. Standard costs in Sage X3 are updated once a quarter.

    Olivier Garnier · Purchasing Manager
    ExcelOutlookSage X3
    Feb 10
    Indexed Contracts and Margin

    38 contracts carry a raw-material index clause, about €11M of annual sales. Sandrine recalculates them at quarter end. On average, an increase reaches the invoice nine weeks after the supplier notice.

    Sandrine Lefèvre · Finance Director
    Sage X3Excel
    Feb 11
    Technical Questions Desk

    About 45 customer technical questions a week: dilution, substrate compatibility, storage, product substitution. Answers depend on 2,300 trial reports filed by year and customer name. Average reply: 3.2 working days.

    Mathieu Colin · Technical Service Manager
    SharePointOutlook
    Feb 12
    Planning and Out-of-Spec Batches

    Planning runs in Excel from Sage X3 orders. When a batch fails a test and needs a correction addition, Élodie hears it from the lab by phone and reshuffles the plan by hand.

    Élodie Fournier · Production Planner
    Sage X3ExcelLIMS
    Feb 13
    Systems and Data Flows

    Mapped every link between systems. The LIMS has no interface to Sage X3. The SDS tool holds formulas copied from Sage X3 by hand, last fully checked in 2023.

    Romain Dubois · IT and ERP Lead
    Sage X3LIMSSDS toolSharePoint
  3. Week 3
    Feb 16 to Feb 20

    Follow-up shadowing and data analysis

    Supplier backlog sampled. 12 weeks of requests and 6 months of release data analysed.

    People: Nadia Benali, Julien Roux, Thierry Vasseur

    Daily detail · 5 days
    Feb 16
    Supplier SDS Backlog Review

    Reviewed 20 of the 61 pending supplier SDS updates with Nadia. 6 change a hazard statement or a concentration limit, which can change the classification of finished products.

    Nadia Benali · Head of Regulatory Affairs
    SDS toolSage X3
    Feb 17
    Release Queue on Site 2

    Followed the release queue on the second site. Results were complete by late morning. Release waited for Julien, who covers both sites and two customer audits a month.

    Julien Roux · QC Lab Manager
    LIMSSage X3
    Feb 18
    Request Log Analysis

    Analysed 12 weeks of the regulatory mailbox: 1,020 requests, an average reply of 6.5 working days, and 22% of requests followed by a customer reminder.

    Outlook
    Feb 19
    Release and Shipment Data

    Analysed 6 months of release timestamps and dispatch records: 1.6 days on average from last result to release, and 31 planned truck departures that left without at least one batch.

    Sage X3LIMS
    Feb 20
    Process Map Construction

    Built process maps for all 16 workflows and compared each one with the written procedure and with what we observed.

  4. Week 4
    Feb 23 to Feb 27

    Internal Analysis

    7 opportunities scored, value modelled, risks and roadmap drafted.

    People: No interviews this week

    Daily detail · 5 days
    Feb 23
    Opportunity Scoring

    Identified 7 opportunities across 4 departments. Scored each by complexity, value, dependencies and who keeps the decision.

    Feb 24
    Key-Person Mapping

    Listed the tasks only one person can do today. Found 3 critical single points of failure: regulatory classification, ADR documents and lab release.

    Feb 25
    Value Model

    Modelled released capacity, margin recovered on indexed contracts and fewer missed departures. Kept capacity, cash timing and margin in separate lines.

    Feb 26
    Roadmap Design

    Sequenced the work so the SDS version log and ADR master data exist before the flows that depend on them.

    Feb 27
    Internal QA

    Checked every figure against interview notes and data extracts. Removed overlaps between friction rows.

  5. Week 5 · Handover
    Mar 2 to Mar 6

    Validation and handover

    Findings validated with the people who do the work. War Map delivered and first initiatives agreed.

    People: Nadia Benali, Julien Roux, Karim Haddad, Olivier Garnier, Sandrine Lefèvre, Hélène Marchand, Thierry Vasseur

    Daily detail · 5 days
    Mar 2
    Validation with Regulatory, Lab and Dock

    Walked through each process map and friction row. Two time estimates were lowered after their review.

    Nadia Benali · Head of Regulatory Affairs
    Mar 3
    Validation of Pricing Figures

    Checked the indexation lag and the margin model against last year's invoices. Agreed to show recovered margin separately from released capacity.

    Olivier Garnier · Purchasing Manager
    Sage X3Excel
    Mar 4
    Final QA

    Final pass on numbers, wording and the roadmap. Prepared handover material.

    Mar 5
    Pre-Handover Review

    Reviewed findings and priorities. Confirmed that release, pricing and regulatory sign-off stay with named people in every initiative.

    Hélène Marchand · CEO
    Mar 6
    Final Handover + War Map Delivery

    Delivered the War Map. Agreed on the first three initiatives and a named owner for each.

    Hélène Marchand · CEO

What We Heard

“

“Every supplier SDS update could change one of our classifications. I have 61 waiting, and I open the oldest first, hoping nothing urgent sits further down.”

Nadia Benali, Head of Regulatory Affairs
“

“The batch passed at ten in the morning. It was released the next afternoon because I spent the day in a customer audit.”

Julien Roux, QC Lab Manager
“

“When I'm on holiday, class 8 orders wait for me, or someone copies last week's transport document. I don't like either option.”

Karim Haddad, Shipping Lead and ADR Safety Adviser
“

“Caustic soda moved 30% in one quarter. Our indexed customers saw it on their invoices about nine weeks later.”

Olivier Garnier, Purchasing Manager
“

“The answer is usually in a trial report from 2017. Finding it can take longer than running the test again.”

Mathieu Colin, Technical Service Manager

Team Members Interviewed

HM
Hélène Marchand
CEO · Executive
TV
Thierry Vasseur
Plant Director · Production
NB
Nadia Benali
Head of Regulatory Affairs · Regulatory
JR
Julien Roux
QC Lab Manager · Quality Control
CP
Camille Perrin
Customer Service Lead · Customer Service
OG
Olivier Garnier
Purchasing Manager · Purchasing
SL
Sandrine Lefèvre
Finance Director · Finance
MC
Mathieu Colin
Technical Service Manager · Technical Service
KH
Karim Haddad
Shipping Lead and ADR Safety Adviser · Logistics
ÉF
Élodie Fournier
Production Planner · Production
RD
Romain Dubois
IT and ERP Lead · IT

Systems Accessed

Sage X3ERP
Automatic
Orders, stock, batches and invoicing work. ADR data missing on 30% of items. Standard costs updated quarterly.
LIMS (on-premise, 2014)Laboratory system
Broken
Action needed
Holds every test result. No interface to Sage X3 or to the certificate templates.
SDS authoring toolRegulatory
Manual
Action needed
Generates SDS in 24 languages. Formulas copied from Sage X3 by hand. No record of which customer received which version.
ExcelOperational layer
Manual
Action needed
340 certificate templates, price tracker, customer code cross-reference, planning and ADR points calculation.
Outlook shared mailboxesCommunication
Manual
Action needed
Regulatory, customer service and technical requests arrive here and are sorted by hand.
SharePointDocuments
Automatic
Stores SDS PDFs, specifications and trial reports. Folders work; version control and search are weak.
Automatic
Manual
Broken
Next Chapter
Findings

Strategy Session · 30 min

A real engagement is scoped in the Strategy Session and may begin with a War Map or a bounded Feasibility Sprint.

Request a Strategy Session