Maker of natural personal-care and household products · 1 plant in the Loire valley · 190 employeesThis War Map shows how we turn an operational review into an implementation plan. The dates show a possible sequence; the scope and schedule of a real engagement are agreed with you.
Implementation plan
What we fix, in which order and what stops slipping. 8 initiatives across 4 departments. €470-670K illustrative annual gross value.
Priorities at a glance
- 8 initiatives across 4 departments
- €470K to €670K in illustrative annual gross value
- Sample target: claim matching and order status answers live before the December peak
- Target: product data entered once, every promotion claim checked, launches weeks shorter
Automation Opportunity Map
The goal is not to add AI on top of chaos. The goal is to turn repeated fires into infrastructure: context assembled automatically, decisions routed to the right level, exceptions escalated only when human judgment is actually needed. The figures below show direct value by initiative. Broader operational value is modeled separately.
Matching and updates use deterministic rules. An agent can classify a free-text request, gather records or draft a response. Software-enforced access, validation, duplicate handling and named human approvals govern consequential actions.
The two estimates (direct value by initiative; projected annual value by operational effect) are alternative, overlapping views. Do not add them. Ranges are teaching assumptions without source measurements: volumes, time, loaded cost and error cost require validation. Investment, operation and adoption ramp remain to be deducted.
Implementation Timeline
Weeks are relative to implementation start; months represent four four-week blocks. Dependent work can be prepared in parallel with test fixtures, but production release waits for sync acceptance. This is a scenario schedule.
Promotion Claim Matching
Weeks 2 to 6
Order Status Answers
Weeks 2 to 5
Marketplace Returns Check
Weeks 3 to 5
Artwork Review Flow
Weeks 4 to 9
Product Data Hub
Weeks 4 to 12
Promotion Calendar Link
Weeks 6 to 9
Forecast Assembly
Weeks 8 to 13
Listing Health Watch
Weeks 11 to 14
Retailer sell-out feeds and price files
Weeks 14 to 16
Month 1: Claim matching starts on the two largest retailers. Order status answers and the returns check go live before the December peak. A person reviews every drafted reply and every flagged claim.
Month 2: Artwork review flow used for all new pack changes. Product data hub in progress, starting with the data pool connection. Promotion calendar shared with planning.
Month 3: Product data published from the PIM to Divalto, the data pool and Amazon. Forecast assembly ready for the January S&OP. Target: measure proof rounds, data warnings and claim recoveries against the September baseline.
Month 4: Listing health watch live and retailer feeds in progress. A second product data coordinator and a second planner run each workflow before handover is accepted.
Projected Annual Value
Direct initiative value counts each build on its own; projected value adds launch timing and shared effects. Earlier launch margin assumes the listing date is the constraint and applies only where shelf space is already agreed. Released capacity means hours moved from copying and chasing to brand, sales and supply work; no headcount reduction is assumed. Claim recoveries depend on retailer agreement and are estimated from a sample.
How much time could this free up?
Choose one non-overlapping task category and the people who actually perform it. These inputs are scenario assumptions; replace them with a measured baseline.
2,232
Task hours per week
€2,901,600
Annual cost allocated to this work
892.8
Potentially released hours per week
€1,160,640
Annual gross value of that capacity
Hours = people × weekly hours × task share. Allocated cost = people × annual loaded cost × task share. Potential capacity multiplies each by the releasable share.
This is not net ROI or a payroll saving. Necessary manual work remains. Adoption and quality must be measured; actual uptake may be lower. Implementation investment, model and hosting costs, maintenance and supervision are excluded. Cash savings require a separate spending decision; otherwise the benefit is capacity available for other work.
How We Work
War Map
A real engagement is scoped in the Strategy Session and may begin with a War Map or a bounded Feasibility Sprint.
Request a Strategy SessionDirect accountability. Scope agreed before work begins.