Regional road haulier · 3 depots in Auvergne-Rhône-Alpes · 310 employees, 190 trucksThis War Map shows how we turn an operational review into an implementation plan. The dates show a possible sequence; the scope and schedule of a real engagement are agreed with you.
Implementation plan
What we fix, in which order and what the company stops giving away. 8 initiatives across 4 departments. €475-670K illustrative annual gross value.
Priorities at a glance
- 8 initiatives across 4 departments
- €475K to €670K in illustrative annual gross value
- Sample target: extras capture and fuel surcharge engine in production in month 1
- Target: every wait billed with evidence where the contract allows it, every subcontractor checked before booking
Automation Opportunity Map
The goal is not to add AI on top of chaos. The goal is to turn repeated fires into infrastructure: context assembled automatically, decisions routed to the right level, exceptions escalated only when human judgment is actually needed. The figures below show direct value by initiative. Broader operational value is modeled separately.
Matching and updates use deterministic rules. An agent can classify a free-text request, gather records or draft a response. Software-enforced access, validation, duplicate handling and named human approvals govern consequential actions.
The two estimates (direct value by initiative; projected annual value by operational effect) are alternative, overlapping views. Do not add them. Ranges are teaching assumptions without source measurements: volumes, time, loaded cost and error cost require validation. Investment, operation and adoption ramp remain to be deducted.
Implementation Timeline
Weeks are relative to implementation start; months represent four four-week blocks. Dependent work can be prepared in parallel with test fixtures, but production release waits for sync acceptance. This is a scenario schedule.
Fuel Surcharge Engine
Weeks 2 to 3
Extras Capture
Weeks 2 to 6
Driver Compliance Watch
Weeks 3 to 5
Order Intake Assistant
Weeks 3 to 9
POD Matching
Weeks 5 to 10
Planning Board Feed
Weeks 6 to 10
Subcontractor Desk
Weeks 8 to 12
Claim File Builder
Weeks 11 to 14
Customer portal and EDI order feeds
Weeks 13 to 16
Month 1: Fuel surcharge engine live for the next monthly index. Extras capture starts with the five largest customers. Driver compliance alerts running. Billing validates every proposed extra before it is invoiced.
Month 2: Order intake assistant handles emailed orders at Lyon. POD matching in progress. First full month of extras invoiced with timestamps; disputes tracked by customer.
Month 3: Order intake extended to Clermont-Ferrand and Valence. Planning board feed and subcontractor desk in use. Target: measure keying hours, extras billed and subcontracting prices against the June baseline.
Month 4: Claim file builder live; customer portal and EDI feeds in progress. A second planner per depot and a second billing clerk run each workflow before handover is accepted.
Projected Annual Value
Direct initiative value counts each build on its own; projected value adds shared effects. Extras are revenue for work already performed, billed only where the customer contract allows it, and collection depends on customer acceptance. Released capacity means hours moved from keying and chasing to planning and customer work; no headcount reduction is assumed. Subcontracting savings assume better price visibility, with Cédric still negotiating every trip.
How much time could this free up?
Choose one non-overlapping task category and the people who actually perform it. These inputs are scenario assumptions; replace them with a measured baseline.
2,232
Task hours per week
€2,901,600
Annual cost allocated to this work
892.8
Potentially released hours per week
€1,160,640
Annual gross value of that capacity
Hours = people × weekly hours × task share. Allocated cost = people × annual loaded cost × task share. Potential capacity multiplies each by the releasable share.
This is not net ROI or a payroll saving. Necessary manual work remains. Adoption and quality must be measured; actual uptake may be lower. Implementation investment, model and hosting costs, maintenance and supervision are excluded. Cash savings require a separate spending decision; otherwise the benefit is capacity available for other work.