Pharma and life sciences
Operational Reality

Sample War Map

Pharma and life sciences War Map

Pharmaceutical CDMO · oral solids and liquids · 1 GMP site in Centre-Val de Loire · 290 employees

Batch records go back to production 2.4 times on average before QA can finish review, and release takes 19 working days against 10 in client agreements. The plan starts where validation burden is low and leaves every certification with the Qualified Person.

A War Map is an operating map built from real cases and expert interviews. It shows where the business is fragile, what that costs, and what to fix first.

What you receive

  1. 01Operational Reality

    How the work really runs: people, systems, handoffs and exceptions.

  2. 02Findings

    What it costs: quantified problems, process gaps and key-person risks.

  3. 03Implementation plan

    What to fix first: prioritized systems, timeline and value drivers.

Request a Strategy Session

30 minutes. We recommend the right starting point.

Read the sampleSee all industry War Maps

Pharmaceutical CDMO · oral solids and liquids · 1 GMP site in Centre-Val de Loire · 290 employeesThis War Map shows how we turn an operational review into an implementation plan. The dates show a possible sequence; the scope and schedule of a real engagement are agreed with you.

Operational Reality

This is what we deliver: a map of where the business is fragile, what it costs, what to automate first, and which systems should exist so leadership can stop carrying the operation by hand.

Illustrative five-week work plan, September 7 to October 9, 2026. Twelve interview roles across nine departments and seven systems on one GMP site. Every flow classified GxP or non-GxP with the validation lead. The final week is split into synthesis and handover.

Release cycle
19 working days
from end of manufacturing to certification, against 10 in quality agreements
Correction loops
2.4 per batch record
between QA and production before review can close
Overdue deviations
41%
closed after the 30-day target
12
Team members interviewed
across 9 departments
7
Systems accessed
2 with critical gaps
21
Workflows documented
15 with manual exceptions
31
Friction points identified
9 classified as critical

Five-week sample timeline · six work blocks

One row per week. Open a week to see each working day.

  1. Week 1
    Sep 7 to Sep 11

    Quality leadership and release

    Scope and GMP boundaries set with the Qualified Person. Batch record review, release planning and floor corrections shadowed.

    People: François Delattre, Isabelle Roussel, Anne-Sophie Lemaire, Laetitia Morel, Guillaume Texier, Benoît Lacroix

    Daily detail · 5 days
    Sep 7
    Kickoff + Scope Alignment

    Agreed scope and ground rules. Chose release, deviation and change control flows for shadowing. Confirmed that the War Map observes GMP work without changing any validated system.

    François Delattre · CEO
    SAPExcel
    Sep 8
    Certification and Release Criteria

    Walked through what the QP needs before certifying a batch. Agreed upfront: no agent output may enter a certification decision, and any tool touching GxP data is classified before use.

    Anne-Sophie Lemaire · Qualified Person (Pharmacien responsable)
    SAPeQMSEDMS
    Sep 9
    Batch Record Review Shadow

    Followed the review of a 260-page executed record: 14 documentation queries, 2 return trips to production, 7.5 hours of review spread over 4 days.

    Laetitia Morel · Batch Record Reviewer
    Paper BMReQMS
    Sep 10
    Release Planning

    Guillaume rebuilds the release plan twice a week from SAP, LIMS and eQMS exports. Three copies of the tracker circulate. 68 batches were awaiting certification that day.

    Guillaume Texier · QA Operations Manager
    ExcelSAPLIMS
    Sep 11
    Corrections on the Floor

    Followed record corrections back to the floor. The operator is found on another shift, the correction is dated and signed, and the record returns to QA, sometimes days later.

    Benoît Lacroix · Production Manager
    Paper BMRSAP
  2. Week 2
    Sep 14 to Sep 18

    Quality systems, clients and suppliers

    Deviation, client request and supplier flows mapped. 23 GxP systems inventoried and classification criteria agreed.

    People: Guillaume Texier, Claire Baudin, Valérie Hamon, Émilie Carpentier, Mehdi Saïdi

    Daily detail · 5 days
    Sep 14
    Deviation and CAPA Walkthrough

    About 38 deviations a month. Investigations are written in Word and attached to the eQMS. Similar past cases are found by memory. 41% close after the 30-day target.

    Guillaume Texier · QA Operations Manager
    eQMSExcel
    Sep 15
    QC Lab and Out-of-Specification Results

    QC results are complete a median of 6 working days after manufacturing. Open out-of-specification investigations were holding 9 of the 68 batches awaiting certification.

    Claire Baudin · QC Manager
    LIMSeQMS
    Sep 16
    Client Requests and Quality Agreements

    About 55 client document requests a week: certificates, batch documentation packs, deviation reports, nitrosamine and elemental impurity statements. 35 quality agreements, each with its own notification and release clauses.

    Valérie Hamon · Client Project Manager
    OutlookEDMS
    Sep 17
    Supplier Qualification Files

    240 approved suppliers tracked in an Excel register. 37 files hold at least one expired document: GMP certificate, quality questionnaire or TSE/BSE statement.

    Émilie Carpentier · Supplier Quality Specialist
    ExcelOutlookSAP
    Sep 18
    Computerised Systems and Validation

    Reviewed the inventory of 23 GxP systems against EU GMP Annex 11. Agreed criteria for read-only non-GxP tools and the validation route for anything that supports a GxP decision.

    Mehdi Saïdi · Validation and IT Lead
    eQMSLIMSSAPEDMS
  3. Week 3
    Sep 21 to Sep 25

    Change control, supply, finance and data

    Change control and cash impact mapped. 12 months of release and deviation data analysed.

    People: Anne-Sophie Lemaire, Valérie Hamon, Pascal Renaud, Nathalie Prévost

    Daily detail · 5 days
    Sep 21
    Change Control and Client Notification

    About 22 change controls opened per month. Client impact is checked by reading quality agreements in PDF. Two client notifications went out late in the last 12 months, both raised in client audits.

    Anne-Sophie Lemaire · Qualified Person (Pharmacien responsable)
    eQMSEDMS
    Sep 22
    Supply and Release Timing

    Shipping dates are promised from the production plan, without a release forecast. Pascal phones QA every day to know which batches can ship.

    Pascal Renaud · Supply Chain Manager
    SAPExcel
    Sep 23
    Cash Impact of Release Delays

    Batches are invoiced at certification. The 68 batches waiting represent about €3.1M of invoicing, at an average of €45K per batch.

    Nathalie Prévost · CFO
    SAPExcel
    Sep 24
    Release Data Analysis

    Analysed 12 months of release dates for 1,404 batches: 19 working days on average from end of manufacturing to certification, against 10 in most quality agreements.

    SAPLIMS
    Sep 25
    Deviation History Analysis

    Analysed 456 deviations from the last 12 months. 41% closed after 30 days. Five root-cause categories account for 62% of cases.

    eQMS
  4. Week 4
    Sep 28 to Oct 2

    Internal Analysis

    7 opportunities scored and classified GxP or non-GxP. Validation route and value modelled.

    People: No interviews this week

    Daily detail · 5 days
    Sep 28
    Opportunity Scoring and GxP Classification

    Identified 7 opportunities across 3 departments. Classified each with the validation lead's criteria: non-GxP, GxP-supporting with human review, or validation required before use.

    Sep 29
    Validation Strategy

    Defined the route for the batch record pre-check: run in parallel with full review first, then validate as a review aid under Annex 11 before any reliance.

    Sep 30
    Value Model

    Modelled released QA capacity, earlier invoicing and fewer late shipments. Separated one-time working capital from annual value.

    Oct 1
    Roadmap Design

    Sequenced non-GxP and low-validation work first. Placed the quality agreement register ahead of change control support.

    Oct 2
    Internal QA

    Checked every figure against interviews and data. Checked the wording so that no initiative implies a tool decides on GMP compliance.

  5. Week 5
    Oct 5 to Oct 7

    Synthesis

    Findings and validation route reviewed with quality leadership.

    People: Anne-Sophie Lemaire, Guillaume Texier, Mehdi Saïdi

    Daily detail · 3 days
    Oct 5
    Deliverable Assembly

    Assembled the War Map in three chapters, with the GxP classification of each initiative attached.

    Oct 6
    Cross-Validation with Quality

    Reviewed findings and the validation route. The QP asked that the pre-check stay advisory until its validation report is approved. Plan updated accordingly.

    Anne-Sophie Lemaire · Qualified Person (Pharmacien responsable)
    Oct 7
    Final QA + Review

    Final pass on numbers, GMP wording and the roadmap. Prepared handover material.

  6. Week 5 · Handover
    Oct 8 to Oct 9

    Handover

    War Map delivered and governance agreed with leadership and the QP.

    People: François Delattre, Isabelle Roussel, Anne-Sophie Lemaire

    Daily detail · 2 days
    Oct 8
    Pre-Handover Review

    Walked leadership through findings and GxP boundaries. Confirmed the budget range and the first two non-GxP initiatives.

    François Delattre · CEO
    Oct 9
    Final Handover + War Map Delivery

    Delivered the War Map. Agreed governance: QA owns every GxP-related change, with a monthly review chaired by the QP.

    François Delattre · CEO

What We Heard

“

“I certify what I can defend in front of an inspector. When the file arrives clean, I need an hour. When it arrives with twenty open questions, I need a week.”

Anne-Sophie Lemaire, Qualified Person (Pharmacien responsable)
“

“Half my review time goes to finding out who wrote a time without signing it, and asking them to come and correct it.”

Laetitia Morel, Batch Record Reviewer
“

“The release plan exists in three Excel files. On Monday they agree. By Wednesday they tell three different stories.”

Guillaume Texier, QA Operations Manager
“

“Clients ask me every day where their batch is. I find out by phoning QA, which slows down the people doing the release.”

Valérie Hamon, Client Project Manager
“

“If a tool touches a GMP decision, I have to validate it. So start where it doesn't, and prove it there first.”

Mehdi Saïdi, Validation and IT Lead

Team Members Interviewed

FD
François Delattre
CEO · Executive
IR
Isabelle Roussel
Site Director · Site Operations
AL
Anne-Sophie Lemaire
Qualified Person (Pharmacien responsable) · Quality Assurance
GT
Guillaume Texier
QA Operations Manager · Quality Assurance
LM
Laetitia Morel
Batch Record Reviewer · Quality Assurance
ÉC
Émilie Carpentier
Supplier Quality Specialist · Quality Assurance
BL
Benoît Lacroix
Production Manager · Production
CB
Claire Baudin
QC Manager · Quality Control
MS
Mehdi Saïdi
Validation and IT Lead · Validation and IT
VH
Valérie Hamon
Client Project Manager · Client Services
PR
Pascal Renaud
Supply Chain Manager · Supply Chain
NP
Nathalie Prévost
CFO · Finance

Systems Accessed

SAP ECC 6.0ERP
Automatic
Batch management, stock status and invoicing work. Release status set by QA. Migration to S/4HANA planned for 2028.
LIMS (validated)Laboratory system
Automatic
QC results recorded, reviewed and approved. No link to the batch record or the release tracker.
eQMS (validated)Quality management
Manual
Action needed
Deviations, CAPA and change control recorded here. Investigations written in Word and attached. Searching past cases is limited to keywords.
Document management (EDMS)Controlled documents
Automatic
SOPs, specifications, master batch records and approved certificates, under version control.
Paper batch recordsExecuted records
Manual
Action needed
180-400 pages per batch, filled in by hand on the floor and scanned to the EDMS after certification.
Excel release trackerPlanning
Broken
Action needed
Three copies rebuilt twice a week from exports. Used informally to plan release and promise dates.
Outlook and client portalsCommunication
Manual
Action needed
Client requests arrive by email and through 6 client portals. Sorted and answered by hand.
Automatic
Manual
Broken
Next Chapter
Findings

Strategy Session · 30 min

A real engagement is scoped in the Strategy Session and may begin with a War Map or a bounded Feasibility Sprint.